log

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
log [2023/06/01 12:12] – [13th Meeting (2023-06-01)] team4log [2023/06/15 11:13] (current) – [13th Week Report] team4
Line 51: Line 51:
 The development of the prototype model has advanced significantly. Based on their suitability and availability, we decided on the final selection of the materials and components. We also explored various lift options during this week. The development of the prototype model has advanced significantly. Based on their suitability and availability, we decided on the final selection of the materials and components. We also explored various lift options during this week.
 ==== 11th Week Report ==== ==== 11th Week Report ====
 +This week we worked on the prototype and worked on our paper. We then had to adjust our list of materials because we got some parts from the school. We also worked on the electric schematic to make it correct and finally we continued to work on the packaging.
 +
 +
 ==== 12th Week Report ==== ==== 12th Week Report ====
 Our team concentrated on creating a complete packaging solution for the project during this week. To ensure the product's safety during storage and transportation, we took into account a number of factors, including safety, toughness, and aesthetic appeal. To develop a successful packaging solution, numerous discussions and design revisions were made. Our team concentrated on creating a complete packaging solution for the project during this week. To ensure the product's safety during storage and transportation, we took into account a number of factors, including safety, toughness, and aesthetic appeal. To develop a successful packaging solution, numerous discussions and design revisions were made.
 ==== 13th Week Report ==== ==== 13th Week Report ====
 +During this week we focused on starting writing the user manual. Additionally, we finalized and corrected some aspects of the project such as the 3D model video, SWOT analysis for the marketing plan and project management part of the report. Work on the packaging for the gas lift started as well. 
 ==== 14th Week Report ==== ==== 14th Week Report ====
 ===== Meetings ===== ===== Meetings =====
Line 199: Line 203:
 ==== 14th Meeting  (2023-06-07) ==== ==== 14th Meeting  (2023-06-07) ====
 === Agenda: === === Agenda: ===
 +1. Discussion about the paper.\\
 +2. Progress of the prototype.\\
 +3. Stress analysis for packaging.\\
 === Minute: === === Minute: ===
 +We discussed the paper and what changes we made, but also what still has to be changed. Then we moved over to show our progress on the prototype and finished with some questions about the stress analysis for the packaging.
 ==== 15th Meeting  (2023-06-15) ==== ==== 15th Meeting  (2023-06-15) ====
 === Agenda: === === Agenda: ===
 +  - Show progression of code
 +  - Discuss about the paper
 +  - Progression of user manual
 +  - Ask about strength analysis
 + 
 === Minute: === === Minute: ===
 +We started the meeting by showing the progression of the code. Then we received feedback on our paper and received help in some aspects regarding it. Next, we discussed our user manual, which still needs some finishing and shortening of the text.
 ==== 16th Meeting  (2023-06-22) ==== ==== 16th Meeting  (2023-06-22) ====
 === Agenda: === === Agenda: ===
Line 211: Line 223:
   - Individual feedback   - Individual feedback
 === Minute: === === Minute: ===
 +We presented our Final presentation and got some feedback on it. After that we got some individual feedback.
 ===== Activities ===== ===== Activities =====
  
Line 226: Line 238:
 |22 Mar.2023 |29 Mar.2023 |Technical drawings and system schematics |We have to make engineering drawings of our product and its elements and make system schematics. | Whole team | |22 Mar.2023 |29 Mar.2023 |Technical drawings and system schematics |We have to make engineering drawings of our product and its elements and make system schematics. | Whole team |
 |29 Mar.2023 |16 Apr.2023 |Interim presentation |We are preparing the report and presentation for the interim presentation. | Whole team | |29 Mar.2023 |16 Apr.2023 |Interim presentation |We are preparing the report and presentation for the interim presentation. | Whole team |
 +|16 Apr.2023 |17 May.2023 |Correction of the report |Based on the feedback from the supervisors we updated the report. |AF, FL |
 +|20 Apr.2023 |26 Apr.2023 |Final list of materials |We did research on materials available for our project and their suppliers to make a final list of materials needed for the prototype. |Whole Team | 
 +|20 Apr.2023 |26 Apr.2023 |Leaflet |We created a leaflet for our product. |Whole Team |
 +|20 Apr.2023 |26 Apr.2023 |3D model video |Our team members started to work on 3D model video of the product. |LH, AT |
 +|20 Apr.2023 |26 Apr.2023 |Flyer |A flyer for our product was created. |LH |
 +|27 Apr.2023 |03 May.2023 |Materials and prices |Based on the final list of materials, we bought components for the prototype. |LH, AT |
 +|27 Apr.2023 |03 May.2023 |Solidworks model |The Solidworks model was adjusted. |LH |
 +|27 Apr.2023 |03 May.2023 |Packaging |Started the work on packaging. |EB |
 +|27 Apr.2023 |03 May.2023 |Assembly of final product |Final product was assembled. |AT |
 +|27 Apr.2023 |17 May.2023 |Work on software |Started work on software. |SS |
 +|04 May.2023 |17 May.2023 |Paper |Started to work on the article of our project. |AF, FL |
 +|04 May.2023 |17 May.2023 |Mechanisms for prototype |Started to work on mechanisms of the lower parts of the prototype. |FL, LH |
 +|04 May.2023 |17 May.2023 |User journey |Created the user journey. |LH |
 +|18 May.2023 |24 May.2023 |Final packaging solution |Finalized the packaging solution. |EB |
 +|18 May.2023 |24 May.2023 |Presentation for marketing |We worked on and presented our marketing plan. |Whole Team |
 +|25 May.2023 |31 May.2023 |Adjust marketing |Some of the aspects of the marketing plan were adjusted. |AF |
 +|25 May.2023 |31 May.2023 |Finish 3D model video |3D model video was finalized. |LH |
 +|25 May.2023 |07 Jun.2023 |User manual |We created a user manual. |Whole Team |
 +|01 Jun.2023 |07 Jun.2023 |Poster |Created the poster. |LH |
 +|01 Jun.2023 |07 Jun.2023 |Software development |Software development. |SS |
 +|01 Jun.2023 |07 Jun.2023 |Packaging for gas-lift |Created packaging for the gas-lift. |EB |
 +|01 Jun.2023 |07 Jun.2023 |Paper |Adjusted the paper with new data and some corrections. |AT, AF, FL, LH |