| Our team concentrated on creating a complete packaging solution for the project during this week. To ensure the product' | Our team concentrated on creating a complete packaging solution for the project during this week. To ensure the product' | ||
| ==== 13th Week Report ==== | ==== 13th Week Report ==== | ||
| + | During this week we focused on starting writing the user manual. Additionally, | ||
| ==== 14th Week Report ==== | ==== 14th Week Report ==== | ||
| ===== Meetings ===== | ===== Meetings ===== | ||
| Line 237: | Line 238: | ||
| |22 Mar.2023 |29 Mar.2023 |Technical drawings and system schematics |We have to make engineering drawings of our product and its elements and make system schematics. | Whole team | | |22 Mar.2023 |29 Mar.2023 |Technical drawings and system schematics |We have to make engineering drawings of our product and its elements and make system schematics. | Whole team | | ||
| |29 Mar.2023 |16 Apr.2023 |Interim presentation |We are preparing the report and presentation for the interim presentation. | Whole team | | |29 Mar.2023 |16 Apr.2023 |Interim presentation |We are preparing the report and presentation for the interim presentation. | Whole team | | ||
| + | |16 Apr.2023 |17 May.2023 |Correction of the report |Based on the feedback from the supervisors we updated the report. |AF, FL | | ||
| + | |20 Apr.2023 |26 Apr.2023 |Final list of materials |We did research on materials available for our project and their suppliers to make a final list of materials needed for the prototype. |Whole Team | | ||
| + | |20 Apr.2023 |26 Apr.2023 |Leaflet |We created a leaflet for our product. |Whole Team | | ||
| + | |20 Apr.2023 |26 Apr.2023 |3D model video |Our team members started to work on 3D model video of the product. |LH, AT | | ||
| + | |20 Apr.2023 |26 Apr.2023 |Flyer |A flyer for our product was created. |LH | | ||
| + | |27 Apr.2023 |03 May.2023 |Materials and prices |Based on the final list of materials, we bought components for the prototype. |LH, AT | | ||
| + | |27 Apr.2023 |03 May.2023 |Solidworks model |The Solidworks model was adjusted. |LH | | ||
| + | |27 Apr.2023 |03 May.2023 |Packaging |Started the work on packaging. |EB | | ||
| + | |27 Apr.2023 |03 May.2023 |Assembly of final product |Final product was assembled. |AT | | ||
| + | |27 Apr.2023 |17 May.2023 |Work on software |Started work on software. |SS | | ||
| + | |04 May.2023 |17 May.2023 |Paper |Started to work on the article of our project. |AF, FL | | ||
| + | |04 May.2023 |17 May.2023 |Mechanisms for prototype |Started to work on mechanisms of the lower parts of the prototype. |FL, LH | | ||
| + | |04 May.2023 |17 May.2023 |User journey |Created the user journey. |LH | | ||
| + | |18 May.2023 |24 May.2023 |Final packaging solution |Finalized the packaging solution. |EB | | ||
| + | |18 May.2023 |24 May.2023 |Presentation for marketing |We worked on and presented our marketing plan. |Whole Team | | ||
| + | |25 May.2023 |31 May.2023 |Adjust marketing |Some of the aspects of the marketing plan were adjusted. |AF | | ||
| + | |25 May.2023 |31 May.2023 |Finish 3D model video |3D model video was finalized. |LH | | ||
| + | |25 May.2023 |07 Jun.2023 |User manual |We created a user manual. |Whole Team | | ||
| + | |01 Jun.2023 |07 Jun.2023 |Poster |Created the poster. |LH | | ||
| + | |01 Jun.2023 |07 Jun.2023 |Software development |Software development. |SS | | ||
| + | |01 Jun.2023 |07 Jun.2023 |Packaging for gas-lift |Created packaging for the gas-lift. |EB | | ||
| + | |01 Jun.2023 |07 Jun.2023 |Paper |Adjusted the paper with new data and some corrections. |AT, AF, FL, LH | | ||